MV Umoja Rehabilitation

Marine Rehab · 2023

MV Umoja Rehabilitation

Project Overview

MV Umoja required extensive life-extension works to bring the vessel into compliance with current SOLAS and national maritime authority requirements. DMG conducted a full structural survey, designed the rehabilitation scope, and executed the works within a compressed dry-dock schedule to minimise service disruption on the lake route.

Key Features of the Project

  • Full hull plating inspection, renewal, and anti-corrosion treatment
  • Main engine overhaul and auxiliary systems refurbishment
  • Life-saving appliance upgrade (lifeboats, rafts, fire detection)
  • Passenger accommodation refurbishment
  • Electrical systems renewal and LED lighting upgrade
  • Post-docking sea trials and class reinstatement